LNG Commissioning Data Integrity and SIS Alignment
BKOAI built a unified asset registry and aligned SIS tags across engineering and operations systems, improving data integrity, safety compliance, and readiness for the facility’s first cooldown cargo
Goals
- Establish data integrity across all safety-critical facility systems.
- Accelerate readiness for the first LNG gas cooldown cargo.
- Ensure SIS tags remain aligned across engineering and operational databases.
- Create a reliable data foundation for safe LNG production startup.
Challenges
- Dispersed equipment and SIS tags across multiple systems created inconsistencies.
- High risk of safety compromises and startup delays due to database misalignment.
- Engineers lacked a centralized registry for thousands of instruments and components.
- Manual verification processes were time-consuming and prone to human error.
Solutions
- Built a centralized asset registry capturing all equipment and SIS tags.
- Synchronized safety-critical SIS tags across engineering and operational systems.
- Implemented integrity validation to confirm alignment between design documents and live systems.
- Established a structured verification process to reduce redundant manual checks.
Results
- Achieved rapid operational readiness for the first LNG cooldown cargo.
- Reduced SIS misconfiguration risks, ensuring stronger safety compliance.
- Eliminated redundant manual checks, accelerating the commissioning timeline.
- Improved data accuracy and reduced human error across the startup process.